US EPA Begins Next Soil Removal

Here is a photo of installation of steel wall to stabilize area outside soil removal area on southside of former Velsicol plant site (along M-46) in St. Louis. After steel sheet piling is installed. soil will be removed.

Previous
Previous

Gratiot County Herald Reports on New Soil Removal Project 11/10/22

Next
Next

News Reports on Book on St. Louis Health Study